Bart is a recent graduate from Wroclaw University in Poland, where he study Civil and Major Building Engineering. His Master Thesis subject was on reinforced concrete silo for bulk solids subjected to exceptional loads.
Bart previously worked in Poland for one year as a structural engineer before coming to the UK where he will be joining Axiom Structures.
Formwork in place for First Floor of the RC Core at Dimes Place
Steel Frame installed
Still shining, despite miserable winter weather! One of our bespoke houses in Richmond
Basement structure complete on our new 6300sq ft private residential development in North London
One of our deep basement projects in South West London featured on Grand Designs program