Formwork in place for First Floor of the RC Core at Dimes Place. Once completed, the remaining steel frame of the rest of the building can be constructed around it.
Site visit to inspect the installation of the West Wing frame
Temporary façade steelwork and demolition of the internal structure complete
Purpose built five storey block in North London
Steel podium deck supporting a new lightweight metsec frame system in Hayward Heath