The concrete frame at Finchley Road is starting to take shape as the formwork for the 3rd floor is erected.
Site visit to inspect the installation of the West Wing frame
Temporary façade steelwork and demolition of the internal structure complete
Purpose built five storey block in North London
Steel podium deck supporting a new lightweight metsec frame system in Hayward Heath