The bulk excavation for a new basement went swiftly and reached formation level in December 2020 at our project in Harrow Road.
Architect: Shape London Architects
Contractor: ACS
Site visit to inspect the installation of the West Wing frame
Temporary façade steelwork and demolition of the internal structure complete
Purpose built five storey block in North London
Steel podium deck supporting a new lightweight metsec frame system in Hayward Heath