Axiom Structures assisted with the Temporary Works design and structural sequencing works on this deep basement project that recently featured on Channel 4’s Grand Designs program ( http://www.channel4.com/programmes/grand-designs/on-demand/65183-007) The complex temporary works involved suspending the keeper’s lodge in mid-air to allow for the safe formation of the basement structure beneath.
Some lovely completion photographs from a house refurbishment and ground rear extension project we undertook in Chiswick
Bulk excavation reaching formation in December 2020
Major works to 3 mews houses in Knightsbridge
Steel frame and timber infill
Primary steelwork installed