Structural element of Phase 1 on our St Barnabas Church project is nearing completion as the 3 storey concrete frame and sub-terrain car park is complete. Next up, the steel frame will be formed to create the pitched roof structure.
Purpose built five storey block in North London
Steel podium deck supporting a new lightweight metsec frame system in Hayward Heath
Beautiful 6 terrace house development that includes a basement across the whole site in North London
Grade II Listed building which underwent a complete refurbishment and the addition of a rear extension to the two top floors