Union Street fifth floor slab has been poured and power floated.
With work marching on at our first Union Street site, the contractor Ellmers have poured the first section of concrete slab
to the new fifth floor extension.
Next up is the installation of the cranked
steel frames.
Purpose built five storey block in North London
Steel podium deck supporting a new lightweight metsec frame system in Hayward Heath
Beautiful 6 terrace house development that includes a basement across the whole site in North London
Grade II Listed building which underwent a complete refurbishment and the addition of a rear extension to the two top floors